Project Detail

20MW Battery Energy Storage System at 220/132kV Jhampir-I Substation

Smart Engineering Solutions is proud to be the driving force behind Pakistan’s first 20MW/20MWh BESS project at NTDC Jhimpir-1 Nooriabad Thatta as the lead EPC contractor. By successfully delivering the entire spectrum of electrical works—from critical earthing and cable laying to precise terminations—we have set a new benchmark for engineering excellence in the region. We don’t just build infrastructure; we engineer the backbone of Pakistan’s modern energy grid.

Key Facts

  • LocationJhampir, Pakistan
  • ClientNTDC/ ZTT, JSPDI (JV)/SES
  • PeriodOngoing
  • StatusIn Progress
  • CategoryPower